|
© 2001 Topves
|
Risk Management, Safety Management and Loss Control Topves Management System Structure A PDF document briefly describing the Management System Structure that is also given under the "System Structure" hyperlink on the left hand side. The structure described includes the "improvement wheel" which is basically an extension on the Deming Plan-Do-Check-Act Cycle. Look at standing plan development for a brief description about the difference between "Standing Plan" and "Single-use" plan. Also look at structure.
THE principle of RESISTANCE TO CHANGE"The greater the departure of any planned change from the accepted ways of the past, the greater the potential resistance by the people involved.
|